Sl. No | Client | Name of Project | Status |
1 | Abir Infrastructure Private Limited | Laboratory Testing river bed samples for KU Yamne Hydro electric Project, Arunachal Pradesh | Complete |
2 | Aga Khan Foundation | Ground Penetrating Radar (GPR) survey at ISA khand tomb complex in Humayun Tomb as part of Humayun Tomb, sunder Nursery, Nizamuddin Urban renewal Project | Complete |
3 | Ajnara India Limited | Two Nos. of Plate Load Test at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site | Complete |
4 | Ajnara India Limited | Drilling holes of 75mm diameter upto 5m depth at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site | Complete |
5 | Ajnara India Limited | Three Nos. of Plate Load Test at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site | Complete |
6 | Akasva Infrastructure (P) Ltd. | Driving & Installation of driven anchor bars at railway under bridge,1c roshanara bagah | Complete |
7 | Amberg Engineering AG | Carrying out services for rock mechanic testing, construction material testing and seismic refraction line for construction of 2-Lane Tunnel between Upper mall road and Dharanaula or from any suitable place between upper and lower mall road to Dharanaula Road in Almorah City, Uttarakhand | Complete |
8 | Amberg Engineering AG | Installation and Testing of Up-lift soil anchor works at AMB Selfie Square at Sector 37D, Gurgaon | Complete |
9 | Angelique International Ltd | Plate Load & insitu shear test at dam & power house site at Nyabarongo HEP rwanda | Complete |
10 | Angelique International Ltd | Conducting soil test for Stung Tasal Dam Project, Cambodia | Complete |
11 | Angelique International Ltd | Geotechnical Investigations for kakobola and Katende HEP in Democratic Republic of Congo | Complete |
12 | Angelique International Ltd | Drilling of Non-Coring Boreholes nd providing skilled manpower for Consolidation grouting at kakobola HEP, Democratic republic of Congo | Complete |
13 | Antriksh Infratech Private Limited | Stabilization of Slope in Himachal Pradesh Near Bilaspur, Himachal Pradesh | Complete |
14 | Anirudh Civil engineeers and Contractors Pvt. Ltd. | Stabiisation of slope at Ambe Mall, Gorakhpur | Complete |
15 | ARIHANT DRILLINGS PVT.LTD. | Laboraoty Test on Rock Core Samples | Complete |
16 | Aspam Academy Noida | Anchoring, Piling Work at Aspam Scottish School, Sector-62 , Noida | Complete |
17 | Aspam Academy Noida | Ground Anchoring & Shotcreting Work at Aspam Scottish School, Sector-62 , Noida | Complete |
18 | AECOM India Private Limited | Geophysical survey (Seismic Refraction Survey) atVasco-da Gama doubling Project on South Western Railway (Karnataka) | Complete |
19 | Attunli Hydro Electric Power Co. Ltd. | Retrieval of drill rods & clearing of drill holes and thereafter In-situ stress Measurements by Hydrofrac Test method for Attunli HE Project (Arunachal Pradesh) | Complete |
20 | Beaver International (India ) pvt ltd. | Contiguous Pile work At Iconic Tower Orenthum Sector -62, Noida (U.P) | Complete |
21 | Building Materials & Technology Promotion Council | Construction of Demonstration Houses including infrastructure works at Barwaripur, Raibareli (Uttar Pradesh) | Complete |
22 | CESC Limited | Phanchung HEP- Laboratory Test for Mix Design & Silt Analysis | Complete |
23 | CHEM HILL | Vertical Electrical Sounding (VES) Surveying ofr DMICDC Project | Complete |
24 | Coastal Projects Ltd. | Lab Testing of rock core sample from lower Kalnai HEP. | Complete |
25 | Coromandel International Limited | Non Destructive test for RCC Building, visakhapatnam | Complete |
26 | DBM Geotechnics & Constructions pvt. Ltd. | In-situ tests in Drifts/Laboratory Test for Etalin HEP, Arunachal Pradesh | Complete |
27 | DBM Geotechnics & Constructions pvt. Ltd. | Conducting In-situ and Laboratory Test for Attunli hydro Electric Project (Arunachal Pradesh) | Complete |
28 | DCM Shriram Infrastructure Ltd | Laboratory testing of river water samples- Chhatru HEP, | Complete |
29 | Dignity Buildcon Private Limited | Execution of grouted soil nail system at GYS Vision Project, DLF golf couse extension road sector-62, Gurgaon | Complete |
30 | Dignity Buildcon Private Limited | Carrying out Plate Load Test for determing Ultimate Bearing Capacity and Safe Bearing Capacity of soil at sector-62, Gurgaon | Complete |
31 | Dirang Energy Pvt. Ltd. | Physical tests of the construction materials extracted from shoal 3 -Gongri HEP, Arunachal Pradesh | Complete |
32 | Embasy of the United States of America | Conducting Soil Testing outside in permeter walls at Nyaya Marg, Chanakyapuri, New Delhi | Complete |
33 | ERA Infra Engineering Limited | Pullout test as per relevant is code for DMRC-Jama Masjid to Kasmiri Gate | Complete |
34 | ERA Infra Engineering Limited | SHORING WORK Construction of new paid work incl Asscated work AIIMS Campus, Ansari Nagar, New Delhi | Complete |
35 | Etalin Hydro Electric Power Co. Ltd. | Geological and Geotechnical Works- Lab & In-situ for Etalin HEP (Arunachal Pradesh) | Complete |
36 | Geo Data India | Laboratory Tests on rock core samples for detailed feasibility study and framing up of phase wise proposals for construction of 18km long highway tunnel across razdhan pass on road bandipur-gureiz road in Jammu & Kashmir | Complete |
37 | GMR Energy Ltd. | Construction Materials Tests and other Associated Work- 225MW Talong-Londa HEPP, Arunachal Pradesh | Complete |
38 | GVK Ratle Hydro Electric Project Pvt. LTd. | Exploratory Drilling at 810MW Ratle HEP, Jammu & Kashmir | Complete |
39 | GVK Ratle Hydro Electric Project Pvt. Ltd. | Rock Me;chanics Test-690MW Ratle Hydro electric Project, Jammu & Kashmir | Complete |
40 | Gammon India Ltd. | Material send to External Laboratory for soil testing sample from coffer dam . | Complete |
41 | Gammon India Ltd. | In-situ Shear Test | Complete |
42 | GHAI CONSTRUCTION LTD. | Soil Nailling Work in the Railway Embankment near sahibabad Railway Station | Complete |
43 | Gulf Asphalt Pvt. Ltd. | Gulf Petrochem, Plot no 272, Execution of Soil Nailing Work | Complete |
44 | Gurubaksh Singh B.A. Builders Pvt. Ltd. | Excavation by mechanical means including soil Stabilization using soil Nailing system at ofice building Plot NO. 2 & 3 Tolstoy Lane, New Delhi | Complete |
45 | Gurubaksh Singh B.A. Builders Pvt. Ltd. | Excavation by mechanical means including soil Stabilization using soil Nailing system at A-2/22, Safdarjung Enclave, New Delhi | Complete |
46 | Godrej Projects Development Pvt. Ltd. | Insitu Load Test at Sector-44, UM House Gurgaon | Complete |
47 | GYS Real Estate Pvt. Ltd. | Conduct rebar locator test on rectangle , square & circular columns of the building at ground ,2nd & 4th floor at our site M/s GYS real Estates pvt. Ltd. D3/P3B, district center , saket , new Delhi-110017 | Complete |
48 | Hindustan Construction Co. Ltd. | Carrying out Hydrofracture, testing of samples colected and submission of report at access tunnel to power house at Dagachhu HEP, Bhutan | Complete |
49 | Human Care Medical Charitable Trust | Providing Design and Analysis of Micropile for enhancing the SBC for ‘Human Care Medical Charitable Trust’ at Sector6, Dwarka, New Delhi | Complete |
50 | Himachal Baspa Power Company Ltd. | Preparation of Detailed project and consultancy services for Investigation ,Study ,Design and cost effective Solution to slope Stabilization Problems at Sholtu, distt: kinnaur -Himachal pradesh. | Complete |
51 | HOLISTICS Urban Innovations Pvt .Ltd. | Design of contiguous Shore pilling with pile cap beam at top and soil anchor with box beam upto designed founding level for shore piles at the iconic corenthum, plot no -A 41 ,sector -62 , Noida | Complete |
52 | Indian Geotechnical Services | Construction Material Survey/Laboratory Testing on rock core samples, Bunakha HEP, Bhutan | Complete |
53 | Indian Oil Corporation Limited | Carrying out foundation settlement test at Indian Oil Corporation Mathura (UP) | Complete |
54 | Industrial Containers and Closures | Piling work for Constructin of Proposed Building at 41, Okhla Phase-3, New Delhi | Complete |
55 | Jaypee Sports International Ltd. | Ultrasonic Pulse Velocity test at JPSI sports (SDZ), sector 25, yamuna expressway,, gautambudh nagar (UP) | Complete |
56 | JMC Project (India) Ltd. | Nailing work to Reinforced Earth Wall including Drilling , Fixing of Nails and Grouting at Nagapur – Bhandara Road Project | Complete |
57 | JMC Project (India) Ltd. | Temporary Earth Retaining Structure works at supreme Court Additional office Complex (SCAO) ,Pragati Maidan , New delhi | Complete |
58 | JMC Project (India) Ltd. | Restoring RE Wall Stability for Four Laning of Rohtak Bawal Section of NH-71 (Haryana) | Complete |
59 | JMC Project (India) Ltd. | Installing Tieback Anchor for Temporary Earth Retaining Structure at PEMD, construction of Museum at Existing Garage in Schedule-B, President Estate, New Delhi | Complete |
60 | Kamala Hydro Electric Power Co. Ltd. | Geological/Geotechnical Investigations by IN-situ rock mechanics & lab tests for Kamala (1600MW) HEP, Arunachal Pradesh | Complete |
61 | Kamala Hydro electric Power Co. Ltd. | Geoogical Investigation-Drilling of hole of size nx at ch 225 in the existing drift tunnel LDR-3 at PH location- Kamala HEP, Arunachal Pradesh | Complete |
62 | Kangtangshri Hydro Power Pvt. Ltd. | Carrying out laboratory Test for Quarry cum RBM samples for Kangtangshiri HEP, Arunachal Pradesh | Complete |
63 | Karnataka Construction Private Limited | To Ascertain stability of the Ladakhey Building at STNM Hospital, Gangtok | Complete |
64 | Konkan Railway Corporation Ltd. | Supplying, installing & commissioning of piezometers in the existing six nos of bore holes at Chenab Bridge site on the Katra- Dharam section of USBRL Project at J & K | Complete |
65 | Krishna Buildestates Private Limited | Piling & Soil Retention Work for construction of commercial Building- India Bulls House, Sector-104, Dwarka Expressway, Gurgaon | Complete |
66 | Krishna Buildestates Private Limited | Piling & Soil Retention Work for construction of commercial Building- India Bulls House, Sector-104, Dwarka Expressway, Gurgaon | Complete |
67 | KSK Dinchang Hydro Energy Private Ltd. | Construction Materials (coarse aggregate, fine aggregate & construction water for Dinchang HEP Project, Arunachal Pradesh | Complete |
68 | KSK Jameri Hydro Power Private Limited | Testing of construction materials for Jameri HEP, Arunachal Pradesh | Complete |
69 | KSK Upper subansiri Hydro Energy Private Ltd. | Geotechnical Ivestigation , Laboratory test on quarry materials, subansiri upper hydro electric project | Complete |
70 | L & T Construction | Drilling of bore holes by DTH machine | Complete |
71 | L & T Himachal Hydropower Limited | Rock Mechanics Tests on Drill cores & lab testing for rock samples at Sach Khas and Reoli Dugli Hydroelectric Project, Himachal Pradesh | Complete |
72 | Lanco Infratech Limited | Laboratory Tock mechanics Test of Core sampels for Karnali-7 HEP, Nepal | Complete |
73 | Larsen & Toubro Limited | witnessing In-situ Load Testing of Flexural Members at Mall of India Noida | Complete |
74 | Larsen & Toubro Limited | Work for Driving & Installation of Driven Anchor bars | Complete |
75 | Larsen & Toubro Limited | Geotechnical Investigation- Core Drilling At Tagurshit HEP on the River Tagurshit in West Siang District, Arunachal pradesh | Complete |
76 | Larsen & Toubro Limited | Soil Nailing at DMRC, Bhai Veer Singh Marg, New Delhi | Complete |
77 | Larsen & Toubro Limited | In-situ stress test by Hydro-Fracture method, relevant Ex-size drilling associated works inside the power house drift at Kalai-II Hep, Arunachal Pradesh | Complete |
78 | Larsen & Toubro Limited | Soil Nailing works for soil Stabilization of slopes in Wegon Tippler at HMEL Bhatinda | Complete |
79 | LANGAN | Geotechnical Investigation & Soil Testing at US Ambassy ,New Delhi | Complete |
80 | Larsen & Toubro LTd. Construction , buildings & Factories | Soil work at our East block II Project L&T Knowledge city ,Vadodara | Complete |
81 | L & T Geo Structure | Stressing of Ground Anchors for Unity Group Project, Delhi | Complete |
82 | M3M India Private Limited | Soil Stabilization work for M3M ONE, Sector-66 at Girgaon (Haryana) | Complete |
83 | Mechuka Hydro Power Private Limited | Carrying out Laboratory Tests for Quarry samples for Pemashelpu HEP, Arunachal Pradesh | Complete |
84 | Miyar Hydro Electric Power co. Limited | Determination of Earth Resistivity by Wenner Four Electrode Method as per IS Code: 3043, IEEE 81 ; for Miyar Hydro Electric Project, Himachal Pradesh | Complete |
85 | Miyar Hydro Electric Power company Ltd. | Insitu and lab testing for rock, soil and construction material of Miyar HEP, Himachal Pradesh | Complete |
86 | Mountain Fall India Pvt. Ltd. | Laboratory and Insitu Test for Hutong-II HEP, Arunachal Pradesh | Complete |
87 | Multi Model Developers Private Limited | Carrying out Laboratory Tests for rock cre samples for Upper Marsyagdi-1 HEP, Nepal | Complete |
88 | Naying DSC Power Limited | Naying Hep-Insitu Rock Mechanics Test/Laboratory Test on rock core samples | Complete |
89 | Naying DSC Power Limited | Conducting Groutability Test at Naying HEP, Arunachal Pradesh | Complete |
90 | Naying DSC Power Limited | Hydro Fracture and Plate Load Tests for Naying HEP, Arunachal Pradesh | Complete |
91 | Nexus Creations | Geotechnical Investigation in the campus of china Embassy at 50D, Shantipath, New Delhi | Complete |
92 | N.B CONSTRUCTIONS PVT. LTD. | Execution of Pile and Soil Nailing work at Nihal house , Plot no. 154, Sector -44 Gurgaon. | Complete |
93 | Nandini Buildhome consortium Pvt.Ltd | Shotcrete/soil Stabilization/Pile anchoring Systems work | Complete |
94 | Nirmanvridhi constructions Pvt .Ltd. | Carrying out plate load test for determination of safe bearing capacity of Anchor block foundation near penstock alignment at tashiding HEP on river Rathang chu in the state of sikkinm. | Complete |
95 | NTPC ALSTOM Power Services Pvt Ltd. | Soil Nailling Work at NTPC .Talcher site | Complete |
96 | Omaxe Buildhome Ltd. | Investigation and Design of soil Stabilization | Complete |
97 | Parsvnath Developers Ltd. | Investigation & design of slope Stabilization for Foundation Excavation at Parsvnath 27 ,K.G. marg project, New Delhi | Complete |
98 | Pioneer Urban Land Infrastructure Ltd. | Design and Analysis of Retaining wall System for construction of Carriageway at Araya & Presidia in Sector 62, Gurgaon | Complete |
99 | PRAKASH ASPHALTINGS &TOLL HIGHWAYS (INDIA) LTD. | Stablilizing RE panel With Grouted nail and steel end bearing Plate as per design | Complete |
100 | RAWEL SINGH & COMPANY | Geophysical work for Nyera Amari I & II H.P Project (Bhutan) | Complete |
101 | RAWEL SINGH & COMPANY | Geophysical & Laboratory Test for Nyera Amari H.P.Project (Bhutan) PKG-1 | Complete |
102 | RAWEL SINGH & COMPANY | Geophysical & Laboratory Test for Nyera Amari H.P.Project (Bhutan) PKG-2 | Complete |
103 | RAWEL SINGH & COMPANY | Test associated with drilling at Nyera-Amri HPP(Bhutan) | Complete |
104 | RAWEL SINGH & COMPANY | Test associated with drilling at Nyera-Amri HPP(Bhutan) | Complete |
105 | RAWEL SINGH & COMPANY | Geophysical testing work(Seismic Refraction & Electrical Resistivity for Druk Bindu Small Hydropower Alternative 1B, Samtse (Bhutan) | Complete |
106 | RAWEL SINGH & COMPANY | Test associated with drilling at Nyera-Amri HPP(Bhutan) | Complete |
107 | Reciprocal Realestate llp | Soil nailing & project works at Umrao mall at Lucknow | Complete |
108 | Saya Homes Pvt.Ltd. | Contiguoug pilling work with Waler beam erection at “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) | Complete |
109 | Saya Homes Pvt.Ltd. | Contiguoug pilling work with anchoring & shotcreting at “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) | Complete |
110 | Saya Homes Pvt.Ltd. | Contiguoug pilling work with Waler beam erection at “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) | Complete |
111 | Saya Homes Pvt.Ltd. | Soil Nailing and design & Analysis of soil support System | Complete |
112 | SINGH BRONZE POWDER PVT .LTD. | Soil nailling and Shortcreting /Guniting Work for soil excavation for Basement floors & Foundation of I.T. office Building for M/s singh Bronze powder Pvt .Ltd, at plot no. 27,Sector -18 ,urban Estate , Gurgaon . | Complete |
113 | SOWIL Ltd., | Material Investigation for NH-87 form km 0.000 to km 42.791 | Complete |
114 | SP REPCON PRIVATE LTD. | work of Soil stabilization/Hill Slope protection and micro pilling Work for Hotel building “Lamon Tree premier ” (A Unit of Fleur Hotels Pvt.Ltd) Located at Plot no. 1 Village Kalarohi , sisarma, Udaipur , Rajasthan | Complete |
115 | SP REPCON PRIVATE LTD. | Additional work for Soil stabilization/Hill Slope protection and micro pilling Work for Hotel building “Lamon Tree premier ” (A Unit of Fleur Hotels Pvt.Ltd) Located at Plot no. 1 Village Kalarohi , sisarma, Udaipur , Rajasthan | Complete |
116 | VASUNDHARA GRAND | Design and analysis of piling and soil Stabilization Work | Complete |
117 | Yamne power Pvt.Ltd . | Carrying out plate Load test for Lower yamne Stage I & Lower Yamne Stage _II HEPs in upper siang District of Arunachal Pradesh . | Complete |
118 | Omaxe | Investigation and Design of Soil Stabilisation | Complete |
119 | Oriental Structural Engineers Pvt. Ltd. | Stabilising RE Panels with Driven Nail Technique at ECP-2 on NH-2 BOT (Toll) Uttar Pradesh | Complete |
120 | Oriental Structural Engineers Pvt. Ltd. | Stabilising RE Panels with Driven Nail Technique at ECP-2 on NH-2 BOT (Toll) Uttar Pradesh | Complete |
121 | Padmini TT Electronics Pvt. LTd. | Test the stability of the factory building using Non-destructive testing & soil investigation | Complete |
122 | PES Engineers Private Limited | Geotechnical Investigation including drilling, Insitu & laboratory tests for soil and rock sample for Birahi Ganga HEP, Uttarakhand | Complete |
123 | Prasar Bharti New Delhi | Testing of lime mortar in AIR, Broadcasting House at Parliament street, New delhi | Complete |
124 | Punj Lloyd Ltd. | Slope stabilization-investigation, trial tests & desing of soil anchors/nailing system works for proposed strategic storage of crude oil project at Mangalore, Karnataka | Complete |
125 | Rishabh Buildwell Pvt. Ltd. | Earth Retaining Structure work of a (Cloud 9 Tower)Building at Hindon Green Valley, Inderapuram, Ghaziabad (UP) | Complete |
126 | Saya Homes Pvt. Ltd. | Contiguous Piling work with Anchoring & Shotcreting at Saya Gold Avenue, inderapuram, Ghaziabad (UP) | Complete |
127 | Seeds Technical Services | Survey to ascertain integrity of buildings in WHO/SEARO premises in event of significant seismic activity at New Delhi | Complete |
128 | Seli Hydro electric Power Co. Ltd. | Groutability Test at Near Dam Axis, Insitu, Lab & silt testing for rock, soil and construction material of seli HEP, Himachal Pradesh | Complete |
129 | Shantiniketan Properties Private Limited | Non Destructive Testing at Candor Techspace IT/ITES Park, Plot B/2, Sector-62, Noida | Complete |
130 | Shri Madan Real Estate Pvt. Ltd. | Soil Stabilization works for Proposed Commercial cum residential project at 626/1, old Railway road, Dayananad Colony , Gurgaon, Haryana | Complete |
131 | Sikkim Hydro Power Ventures Ltd. | In-situ rock mechanics test in drifts, sam site, rimbi, Rangit HEP stage-II, Sikkim | Complete |
132 | SJVN Limited | Carrying out IN-situ and laboratory test in Dam Area of Luhri Hydro Electric Project | Complete |
133 | SKET & C-KCT Joint Venture | Piezometer Drilling & Installaton for Strategic Storage of Crde Oil Project at Mangalore, Karnataka | Complete |
134 | SMEC India Pvt. Ltd. | Geological & Geotechnical Investigations for the Feasibility Study and Preparation of Preliminary Project Report for the Constructin of Toad Tunnel Enabling All Weather Connectivity along the Mughal Road In the State of Jammu & Kashmir | Complete |
135 | SNC LAVALIN | Geophysical Investigations- Attunli HEP, Arunachal Pradesh | Complete |
136 | Snow and Avalanche Study Establishment | Measurement of Skin Friction and conducting pullout and comparison tests on the anchor piles between Manali to Dhundhi on new alignment to Rohtang Tunnel in (HP) | Complete |
137 | Snow and Avalanche Study Establishment | Soil Testing & grout mix design for overburden strata encountered in himalayas including in creep & glide site near Dhundhi, Himachal Pradesh | Complete |
138 | Snow and Avalanche Study Establishment | Erection snow bridges using micro pile foundation at dhundi area, Himachal Pradesh | Complete |
139 | Sood & Company | Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) | Complete |
140 | Sood & Company | Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) | Complete |
141 | Sood & Company | Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) | Complete |
142 | SP Repcon Private Ltd. | Soil Stabilization/hill slope protection and Micro-Piling work | Complete |
143 | SP Singla Costruction Pvt. Ltd. | Geotechnical Investigation work & construction bridge across river yamuna kalindi kunj on line -8 for phase-III of delhi MRTS Project | Complete |
144 | SPML Energy Limited | Geotechnical Investigation and Drilling works, for Laxman Mandwa Small HEP and Dokarghat Small HEP, Madhya Pradesh | Complete |
145 | Super Hydro Electric Pvt. Ltd. | Plate Load Test in Power House Area at Hydel Power unit at Govindghat, Chamoli, uttarakhand | Complete |
146 | Swadeshi Civil Infrastructure Pvt. Ltd. | Soil Investigation work at JPN Apex Trauma Centre AIIMS, New Delhi | Complete |
147 | Swadeshi Civil Infrastructure Pvt. Ltd. | Soil Nailing work at JPN Apex Trauma Centre AIIMS, New Delhi | Complete |
148 | Tata Projects Brookfield Multiplex JV | Execution of Shoring Works on North Side for the TCG Project, situated at Sector 72, Gurugram, Haryana | Complete |
149 | TATO Hydro Power Pvt. Ltd. | Insitu Rock Mechanics Test- Tato-II HEP, Arunachal Pradesh | Complete |
150 | Tila Karnali Hydro Electric Co. Pvt. Ltd. | Geotechnical Investigations Laboratory test on materials for Tila-2 HEP, Nepal | Complete |
151 | Tractebel Engineering | Nandprayag- langasu HEP- insitu & laboratory rock mechanics test, Uttarakhand | Complete |
152 | Tractebel Engineering | Conducting Geotechnical Investigation, Geophysical Survey, Laboratory test and Construction Material Survey for Patnazi Bunjwah HEP (J & K) | Complete |
153 | Uttar Bharat Hydro Power Pvt. Ltd. | Testing of Mixed Design | Complete |
154 | VS Realprojects Pvt. Ltd. | Installation and testing of up lift soil anchor works at AMB Selfie Square at Sector-37-D, Gurgaon, Haryana | Complete |
155 | WAPCOS | Rehabilitation of pizo-meter house, cladding of Adit, repair of roads in Akosombo Dam/Excavationf trenches and Laying PVC and Perforated PVC Pipes | Complete |
156 | Wapcos | Seismic Refraction Survey conducted at Tangi-e-Shadian, Balkh Province/ Shah Abdullah, Samangan Province /DAHANE DARA of Afghanistan | Complete |
157 | Yamne Power Private Ltd. | Carrying out Hydrometric Analysis, Petrography and X-ray diffraction test/Construction Material Survey/Seismic Refraction Test for lower yamne Stage 1 & stage-1 HEP, Arunachal Pradesh | Complete |
158 | AF Consultant India Pvt. Ltd. | Geotechnical Investigation- In-situ & Laboratory Tests for Dugar Hydro Electric Project Killar, Himachal Pradesh | Complete |
159 | SAYA GoLD AVENUE | Contiguous Piling work with waler beam erection at Saya Gold Avenue, inderapuram, Ghaziabad (UP) | Complete |
160 | Colliers International | Seismic Analysis of NCR Campus for Accentures Pvt. Ltd. | Complete |