Sl. No Client Name of Project Status
1 Abir Infrastructure Private Limited Laboratory Testing river bed samples for KU Yamne Hydro electric Project, Arunachal Pradesh Complete
2 Aga Khan Foundation Ground Penetrating Radar (GPR) survey at ISA khand tomb complex in Humayun Tomb as part of Humayun Tomb, sunder Nursery, Nizamuddin Urban renewal Project Complete
3 Ajnara India Limited Two Nos. of Plate Load Test at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site Complete
4 Ajnara India Limited Drilling holes of 75mm diameter upto 5m depth at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site Complete
5 Ajnara India Limited Three Nos. of Plate Load Test at Ajnara Ambrosia site surrounding UGT & Tower-P at Ajnar Ambrosia Site Complete
6 Akasva Infrastructure (P) Ltd. Driving & Installation of driven anchor bars at railway under bridge,1c roshanara bagah Complete
7 Amberg Engineering AG Carrying out services for rock mechanic testing, construction material testing and seismic refraction line for construction of 2-Lane Tunnel between Upper mall road and Dharanaula or from any suitable place between upper and lower mall road to Dharanaula Road in Almorah City, Uttarakhand Complete
8 Amberg Engineering AG Installation and Testing of Up-lift soil anchor works at AMB Selfie Square at Sector 37D, Gurgaon Complete
9 Angelique International Ltd Plate Load & insitu shear test at dam & power house site at Nyabarongo HEP rwanda Complete
10 Angelique International Ltd Conducting soil test for Stung Tasal Dam Project, Cambodia Complete
11 Angelique International Ltd Geotechnical Investigations for kakobola and Katende HEP in Democratic Republic of Congo Complete
12 Angelique International Ltd Drilling of Non-Coring Boreholes nd providing skilled manpower for Consolidation grouting at kakobola HEP, Democratic republic of Congo Complete
13 Antriksh Infratech Private Limited Stabilization of Slope in Himachal Pradesh Near Bilaspur, Himachal Pradesh Complete
14 Anirudh Civil engineeers and Contractors Pvt. Ltd. Stabiisation of slope at Ambe Mall, Gorakhpur Complete
15 ARIHANT DRILLINGS PVT.LTD. Laboraoty Test on Rock Core Samples Complete
16 Aspam Academy Noida Anchoring, Piling Work at Aspam Scottish School, Sector-62 , Noida Complete
17 Aspam Academy Noida Ground Anchoring & Shotcreting Work at Aspam Scottish School, Sector-62 , Noida Complete
18 AECOM India Private Limited Geophysical survey (Seismic Refraction Survey) atVasco-da Gama doubling Project on South Western Railway  (Karnataka) Complete
19 Attunli Hydro Electric Power Co. Ltd. Retrieval of drill rods & clearing of drill holes and thereafter In-situ stress Measurements by Hydrofrac Test method for Attunli HE Project (Arunachal Pradesh) Complete
20 Beaver International (India ) pvt ltd. Contiguous Pile work  At Iconic Tower Orenthum Sector -62, Noida (U.P) Complete
21 Building Materials & Technology Promotion Council Construction of Demonstration Houses including infrastructure works at Barwaripur, Raibareli (Uttar Pradesh) Complete
22 CESC Limited Phanchung HEP- Laboratory Test for Mix Design & Silt Analysis Complete
23 CHEM HILL Vertical Electrical Sounding (VES) Surveying ofr DMICDC Project Complete
24 Coastal Projects Ltd. Lab Testing of rock core sample from lower Kalnai HEP. Complete
25 Coromandel International Limited Non Destructive test for RCC Building, visakhapatnam Complete
26 DBM Geotechnics & Constructions pvt. Ltd. In-situ tests in Drifts/Laboratory Test for Etalin HEP, Arunachal Pradesh Complete
27 DBM Geotechnics & Constructions pvt. Ltd. Conducting In-situ and Laboratory Test for Attunli hydro Electric Project (Arunachal Pradesh) Complete
28 DCM Shriram Infrastructure Ltd Laboratory testing of river water samples- Chhatru HEP, Complete
29 Dignity Buildcon Private Limited Execution of grouted soil nail system at GYS Vision Project, DLF golf couse extension road sector-62, Gurgaon Complete
30 Dignity Buildcon Private Limited Carrying out Plate Load Test for determing Ultimate Bearing Capacity and Safe Bearing Capacity of soil at sector-62, Gurgaon Complete
31 Dirang Energy Pvt. Ltd. Physical tests of the construction materials extracted from shoal 3 -Gongri HEP, Arunachal Pradesh Complete
32 Embasy of the United States of America Conducting Soil Testing outside in permeter walls at Nyaya Marg, Chanakyapuri, New Delhi Complete
33 ERA Infra Engineering Limited Pullout test as per relevant is code for DMRC-Jama Masjid to Kasmiri Gate Complete
34 ERA Infra Engineering Limited SHORING WORK Construction of new paid work  incl Asscated work AIIMS Campus, Ansari Nagar, New Delhi Complete
35 Etalin Hydro Electric Power Co. Ltd. Geological and Geotechnical Works- Lab & In-situ for Etalin HEP (Arunachal Pradesh) Complete
36 Geo Data India Laboratory Tests on rock core samples for detailed feasibility study and framing up of phase wise proposals for construction of 18km long highway tunnel across razdhan pass on road bandipur-gureiz road in Jammu & Kashmir Complete
37 GMR Energy Ltd. Construction Materials Tests and other Associated Work- 225MW Talong-Londa HEPP, Arunachal Pradesh Complete
38 GVK Ratle Hydro Electric Project Pvt. LTd. Exploratory Drilling at 810MW Ratle HEP, Jammu & Kashmir Complete
39 GVK Ratle Hydro Electric Project Pvt. Ltd. Rock Me;chanics Test-690MW Ratle Hydro electric Project,  Jammu & Kashmir Complete
40 Gammon India Ltd. Material send to External Laboratory for soil testing sample from coffer dam . Complete
41 Gammon India Ltd. In-situ Shear Test Complete
42 GHAI CONSTRUCTION LTD. Soil Nailling Work in the Railway Embankment near sahibabad Railway Station Complete
43 Gulf Asphalt Pvt. Ltd. Gulf Petrochem, Plot no 272, Execution of Soil Nailing Work Complete
44 Gurubaksh Singh B.A. Builders Pvt. Ltd. Excavation by mechanical means including soil Stabilization using soil Nailing system at ofice building Plot NO. 2 & 3 Tolstoy Lane, New Delhi Complete
45 Gurubaksh Singh B.A. Builders Pvt. Ltd. Excavation by mechanical means including soil Stabilization using soil Nailing system at A-2/22, Safdarjung Enclave, New Delhi Complete
46 Godrej Projects Development Pvt. Ltd. Insitu Load Test at Sector-44, UM House Gurgaon Complete
47 GYS Real Estate Pvt. Ltd. Conduct rebar locator test on rectangle , square & circular columns of the building at ground ,2nd & 4th floor at our site M/s GYS real Estates pvt. Ltd. D3/P3B, district center , saket , new Delhi-110017 Complete
48 Hindustan Construction Co. Ltd. Carrying out Hydrofracture, testing of samples colected and submission of report at access tunnel to power house at Dagachhu HEP, Bhutan Complete
49 Human Care Medical Charitable Trust Providing Design and Analysis of Micropile for enhancing the SBC for ‘Human Care Medical Charitable Trust’ at Sector6, Dwarka, New Delhi Complete
50 Himachal Baspa Power Company Ltd. Preparation of Detailed project and consultancy services for Investigation ,Study ,Design and cost effective Solution to slope Stabilization Problems at Sholtu, distt: kinnaur -Himachal pradesh. Complete
51 HOLISTICS Urban Innovations Pvt .Ltd. Design of contiguous Shore pilling with pile cap beam at top and soil anchor with box beam upto  designed founding level for shore piles at the iconic  corenthum, plot no -A 41 ,sector -62 , Noida Complete
52 Indian Geotechnical Services Construction Material Survey/Laboratory Testing on rock core samples, Bunakha HEP, Bhutan Complete
53 Indian Oil Corporation Limited Carrying out foundation settlement test at Indian Oil Corporation Mathura (UP) Complete
54 Industrial Containers and Closures Piling work for Constructin of Proposed Building at 41, Okhla Phase-3, New Delhi Complete
55 Jaypee Sports International Ltd. Ultrasonic Pulse Velocity test at JPSI sports (SDZ), sector 25, yamuna expressway,, gautambudh nagar (UP) Complete
56 JMC Project (India) Ltd. Nailing work to Reinforced Earth Wall including Drilling , Fixing of Nails and Grouting at Nagapur – Bhandara Road Project Complete
57 JMC Project (India) Ltd. Temporary Earth Retaining Structure works at supreme Court Additional office Complex (SCAO) ,Pragati Maidan , New delhi Complete
58 JMC Project (India) Ltd. Restoring RE Wall Stability for  Four Laning of Rohtak Bawal Section of NH-71 (Haryana) Complete
59 JMC Project (India) Ltd. Installing Tieback Anchor for Temporary Earth Retaining Structure at PEMD, construction of Museum at Existing Garage in Schedule-B, President Estate, New Delhi Complete
60 Kamala Hydro Electric Power Co. Ltd. Geological/Geotechnical Investigations by IN-situ rock mechanics & lab tests for Kamala (1600MW) HEP, Arunachal Pradesh Complete
61 Kamala Hydro electric Power Co. Ltd. Geoogical Investigation-Drilling of hole of size nx at ch 225 in the existing drift tunnel LDR-3 at PH location- Kamala HEP, Arunachal Pradesh Complete
62 Kangtangshri Hydro Power Pvt. Ltd. Carrying out laboratory Test for Quarry cum RBM samples for Kangtangshiri HEP, Arunachal Pradesh Complete
63 Karnataka Construction Private Limited To Ascertain stability of the Ladakhey Building at STNM Hospital, Gangtok Complete
64 Konkan Railway Corporation Ltd. Supplying, installing & commissioning of piezometers in the existing six nos of bore holes at Chenab Bridge site on the Katra- Dharam section of USBRL Project at J & K Complete
65 Krishna Buildestates Private Limited Piling & Soil Retention Work for construction of commercial Building- India Bulls House, Sector-104, Dwarka Expressway, Gurgaon Complete
66 Krishna Buildestates Private Limited Piling & Soil Retention Work for construction of commercial Building- India Bulls House, Sector-104, Dwarka Expressway, Gurgaon Complete
67 KSK Dinchang Hydro Energy Private Ltd. Construction Materials (coarse aggregate, fine aggregate & construction water for Dinchang HEP Project, Arunachal Pradesh Complete
68 KSK Jameri Hydro Power Private Limited Testing of construction materials for Jameri HEP, Arunachal Pradesh Complete
69 KSK Upper subansiri Hydro Energy Private Ltd. Geotechnical Ivestigation , Laboratory test on quarry materials, subansiri upper hydro electric project Complete
70 L & T Construction Drilling of bore holes by DTH machine Complete
71 L & T Himachal Hydropower Limited Rock Mechanics Tests on Drill cores & lab testing for rock samples at Sach Khas and Reoli Dugli Hydroelectric Project, Himachal Pradesh Complete
72 Lanco Infratech Limited Laboratory Tock mechanics Test of Core sampels for Karnali-7 HEP, Nepal Complete
73 Larsen & Toubro Limited witnessing In-situ Load Testing of Flexural Members at Mall of India Noida Complete
74 Larsen & Toubro Limited Work for Driving & Installation of Driven Anchor bars Complete
75 Larsen & Toubro Limited Geotechnical Investigation- Core Drilling At Tagurshit HEP on the River Tagurshit in West Siang District, Arunachal pradesh Complete
76 Larsen & Toubro Limited Soil Nailing at DMRC, Bhai Veer Singh Marg, New Delhi Complete
77 Larsen & Toubro Limited In-situ stress test by Hydro-Fracture method, relevant Ex-size drilling associated works inside the power house drift at Kalai-II Hep, Arunachal Pradesh Complete
78 Larsen & Toubro Limited Soil Nailing works for soil Stabilization of slopes in Wegon Tippler at HMEL Bhatinda Complete
79 LANGAN Geotechnical Investigation & Soil Testing at US Ambassy ,New Delhi Complete
80 Larsen & Toubro LTd. Construction , buildings & Factories Soil work at our East block II Project  L&T Knowledge city ,Vadodara Complete
81 L & T Geo Structure Stressing of Ground Anchors for Unity Group Project, Delhi Complete
82 M3M India Private Limited Soil Stabilization work for M3M ONE, Sector-66 at Girgaon (Haryana) Complete
83 Mechuka Hydro Power Private Limited Carrying out Laboratory Tests for Quarry samples for Pemashelpu HEP, Arunachal Pradesh Complete
84 Miyar Hydro Electric Power co. Limited Determination of Earth Resistivity by Wenner Four Electrode Method as per IS Code: 3043, IEEE 81 ; for Miyar Hydro Electric Project, Himachal Pradesh Complete
85 Miyar Hydro Electric Power company Ltd. Insitu and lab testing for rock, soil and construction material of Miyar HEP, Himachal Pradesh Complete
86 Mountain Fall India Pvt. Ltd. Laboratory and Insitu Test for Hutong-II HEP, Arunachal Pradesh Complete
87 Multi Model Developers Private Limited Carrying out Laboratory Tests for rock cre samples for Upper Marsyagdi-1 HEP, Nepal Complete
88 Naying DSC Power Limited Naying Hep-Insitu Rock Mechanics Test/Laboratory Test on rock core samples Complete
89 Naying DSC Power Limited Conducting Groutability Test at Naying HEP, Arunachal Pradesh Complete
90 Naying DSC Power Limited Hydro Fracture and Plate Load Tests for Naying HEP, Arunachal Pradesh Complete
91 Nexus Creations Geotechnical Investigation in the campus of china Embassy at 50D, Shantipath, New Delhi Complete
92 N.B CONSTRUCTIONS PVT. LTD. Execution  of Pile and Soil Nailing work at Nihal house , Plot no. 154, Sector -44 Gurgaon. Complete
93 Nandini Buildhome consortium Pvt.Ltd Shotcrete/soil Stabilization/Pile anchoring Systems work Complete
94 Nirmanvridhi constructions Pvt .Ltd. Carrying out plate load test for determination of safe bearing capacity of Anchor block foundation near penstock alignment at tashiding HEP on river Rathang chu in the state of sikkinm. Complete
95 NTPC ALSTOM Power Services Pvt Ltd. Soil Nailling Work at NTPC .Talcher site Complete
96 Omaxe Buildhome Ltd. Investigation and Design  of soil Stabilization Complete
97 Parsvnath Developers Ltd. Investigation & design of slope Stabilization for Foundation Excavation at Parsvnath 27 ,K.G. marg project, New Delhi Complete
98 Pioneer Urban Land Infrastructure Ltd. Design and Analysis of Retaining wall System for construction of Carriageway at Araya & Presidia in Sector 62, Gurgaon Complete
99 PRAKASH ASPHALTINGS &TOLL HIGHWAYS (INDIA) LTD. Stablilizing RE panel With Grouted nail and steel end bearing Plate as per design Complete
100 RAWEL SINGH & COMPANY Geophysical work for Nyera Amari I & II H.P Project (Bhutan) Complete
101 RAWEL SINGH & COMPANY Geophysical & Laboratory Test for Nyera Amari H.P.Project (Bhutan) PKG-1 Complete
102 RAWEL SINGH & COMPANY Geophysical & Laboratory Test for Nyera Amari H.P.Project (Bhutan) PKG-2 Complete
103 RAWEL SINGH & COMPANY Test associated with drilling at Nyera-Amri HPP(Bhutan) Complete
104 RAWEL SINGH & COMPANY Test associated with drilling at Nyera-Amri HPP(Bhutan) Complete
105 RAWEL SINGH & COMPANY Geophysical testing work(Seismic Refraction & Electrical Resistivity for Druk Bindu Small Hydropower Alternative 1B, Samtse (Bhutan) Complete
106 RAWEL SINGH & COMPANY Test associated with drilling at Nyera-Amri HPP(Bhutan) Complete
107 Reciprocal Realestate llp Soil nailing & project  works at Umrao mall at Lucknow Complete
108 Saya Homes Pvt.Ltd. Contiguoug pilling work with Waler beam erection at  “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) Complete
109 Saya Homes Pvt.Ltd. Contiguoug pilling work with anchoring & shotcreting at  “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) Complete
110 Saya Homes Pvt.Ltd. Contiguoug pilling work with Waler beam erection at  “saya gold avenue ” Project Indirapuram ,Ghaziabad (U.P) Complete
111 Saya Homes Pvt.Ltd. Soil Nailing and design & Analysis of soil support  System Complete
112 SINGH BRONZE POWDER PVT .LTD. Soil nailling and Shortcreting  /Guniting Work for soil excavation for Basement floors & Foundation of I.T. office Building for M/s singh Bronze powder Pvt .Ltd, at plot no. 27,Sector -18 ,urban Estate , Gurgaon . Complete
113 SOWIL Ltd., Material Investigation for NH-87 form km 0.000 to km 42.791 Complete
114 SP REPCON  PRIVATE LTD.  work of Soil stabilization/Hill Slope protection and micro pilling Work for Hotel building  “Lamon Tree  premier ” (A Unit of Fleur Hotels Pvt.Ltd)  Located at Plot  no. 1 Village Kalarohi , sisarma, Udaipur , Rajasthan Complete
115 SP REPCON  PRIVATE LTD. Additional work for Soil stabilization/Hill Slope protection and micro pilling Work for Hotel building  “Lamon Tree  premier ” (A Unit of Fleur Hotels Pvt.Ltd)  Located at Plot  no. 1 Village Kalarohi , sisarma, Udaipur , Rajasthan Complete
116 VASUNDHARA GRAND Design and analysis of piling and soil Stabilization Work Complete
117 Yamne power Pvt.Ltd . Carrying out plate Load test for Lower yamne Stage I & Lower Yamne Stage _II HEPs in upper siang District of Arunachal  Pradesh . Complete
118 Omaxe Investigation and Design of Soil Stabilisation Complete
119 Oriental Structural Engineers Pvt. Ltd. Stabilising RE Panels with Driven Nail Technique at ECP-2 on NH-2 BOT (Toll) Uttar Pradesh Complete
120 Oriental Structural Engineers Pvt. Ltd. Stabilising RE Panels with Driven Nail Technique at ECP-2 on NH-2 BOT (Toll) Uttar Pradesh Complete
121 Padmini TT Electronics Pvt. LTd. Test the stability of the factory building using Non-destructive testing & soil investigation Complete
122 PES Engineers Private Limited Geotechnical Investigation including drilling, Insitu & laboratory tests for soil and rock sample for Birahi Ganga HEP, Uttarakhand Complete
123 Prasar Bharti New Delhi Testing of lime mortar in AIR, Broadcasting House at Parliament street, New delhi Complete
124 Punj Lloyd Ltd. Slope stabilization-investigation, trial tests & desing of soil anchors/nailing system works for proposed strategic storage of crude oil project at Mangalore, Karnataka Complete
125 Rishabh Buildwell Pvt. Ltd. Earth Retaining Structure work of a (Cloud 9 Tower)Building at Hindon Green Valley, Inderapuram, Ghaziabad (UP) Complete
126 Saya Homes Pvt. Ltd. Contiguous Piling work with Anchoring & Shotcreting at Saya Gold Avenue, inderapuram, Ghaziabad (UP) Complete
127 Seeds Technical Services Survey to ascertain integrity of buildings in WHO/SEARO premises in event of significant seismic activity at New Delhi Complete
128 Seli Hydro electric Power Co. Ltd. Groutability Test at Near Dam Axis, Insitu, Lab & silt testing for rock, soil and construction material of seli HEP, Himachal Pradesh Complete
129 Shantiniketan Properties Private Limited Non Destructive Testing at Candor Techspace IT/ITES Park, Plot B/2, Sector-62, Noida Complete
130 Shri Madan Real Estate Pvt. Ltd. Soil Stabilization works for Proposed Commercial cum residential project at 626/1, old Railway road, Dayananad Colony , Gurgaon, Haryana Complete
131 Sikkim Hydro Power Ventures Ltd. In-situ rock mechanics test in drifts, sam site, rimbi, Rangit HEP stage-II, Sikkim Complete
132 SJVN Limited Carrying out IN-situ and laboratory test in Dam Area of Luhri Hydro Electric Project Complete
133 SKET & C-KCT Joint Venture Piezometer Drilling & Installaton for Strategic Storage of Crde Oil Project at Mangalore, Karnataka Complete
134 SMEC India Pvt. Ltd. Geological & Geotechnical Investigations for the Feasibility Study and Preparation of Preliminary Project Report for the Constructin of Toad Tunnel Enabling All Weather Connectivity along the Mughal Road In the State of Jammu & Kashmir Complete
135 SNC LAVALIN Geophysical Investigations- Attunli HEP, Arunachal Pradesh Complete
136 Snow and Avalanche Study Establishment Measurement of Skin Friction and conducting pullout and comparison tests on the anchor piles between Manali to Dhundhi on new alignment to Rohtang Tunnel in (HP) Complete
137 Snow and Avalanche Study Establishment Soil Testing & grout mix design for overburden strata encountered in himalayas including in creep & glide site near Dhundhi, Himachal Pradesh Complete
138 Snow and Avalanche Study Establishment Erection snow bridges using micro pile foundation at dhundi area, Himachal Pradesh Complete
139 Sood & Company Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) Complete
140 Sood & Company Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) Complete
141 Sood & Company Test associated with Drilling at Nyera-Amari Hydro Power Project (Bhutan) Complete
142 SP Repcon Private Ltd. Soil Stabilization/hill slope protection and Micro-Piling work Complete
143 SP Singla Costruction Pvt. Ltd. Geotechnical Investigation work & construction bridge across river yamuna kalindi kunj on line -8 for phase-III of delhi MRTS Project Complete
144 SPML Energy Limited Geotechnical Investigation and Drilling works, for Laxman Mandwa Small HEP and Dokarghat Small HEP, Madhya Pradesh Complete
145 Super Hydro Electric Pvt. Ltd. Plate Load Test in Power House Area at Hydel Power unit at Govindghat, Chamoli, uttarakhand Complete
146 Swadeshi Civil Infrastructure Pvt. Ltd. Soil Investigation work at JPN Apex Trauma Centre AIIMS, New Delhi Complete
147 Swadeshi Civil Infrastructure Pvt. Ltd. Soil Nailing work at JPN Apex Trauma Centre AIIMS, New Delhi Complete
148 Tata Projects Brookfield Multiplex JV Execution of Shoring Works on North Side for the TCG Project, situated at Sector 72, Gurugram, Haryana Complete
149 TATO Hydro Power Pvt. Ltd. Insitu Rock Mechanics Test- Tato-II HEP, Arunachal Pradesh Complete
150 Tila Karnali Hydro Electric Co. Pvt. Ltd. Geotechnical Investigations Laboratory test on materials for Tila-2 HEP, Nepal Complete
151 Tractebel Engineering Nandprayag- langasu HEP- insitu & laboratory rock mechanics test, Uttarakhand Complete
152 Tractebel Engineering Conducting Geotechnical Investigation, Geophysical Survey, Laboratory test and Construction Material Survey for Patnazi Bunjwah HEP (J & K) Complete
153 Uttar Bharat Hydro Power Pvt. Ltd. Testing of Mixed Design Complete
154 VS Realprojects Pvt. Ltd. Installation and testing of up lift soil anchor works at AMB Selfie Square at Sector-37-D, Gurgaon, Haryana Complete
155 WAPCOS Rehabilitation of pizo-meter house, cladding of Adit, repair of roads in Akosombo Dam/Excavationf trenches and Laying PVC and Perforated PVC Pipes Complete
156 Wapcos Seismic Refraction Survey conducted at Tangi-e-Shadian, Balkh Province/ Shah Abdullah, Samangan Province /DAHANE DARA of Afghanistan Complete
157 Yamne Power Private Ltd. Carrying out Hydrometric Analysis, Petrography and X-ray diffraction test/Construction Material Survey/Seismic Refraction Test for lower yamne Stage 1 & stage-1 HEP, Arunachal Pradesh Complete
158 AF Consultant India Pvt. Ltd. Geotechnical Investigation- In-situ & Laboratory Tests for Dugar Hydro Electric Project Killar, Himachal Pradesh Complete
159 SAYA GoLD AVENUE Contiguous Piling work with waler beam erection at Saya Gold Avenue, inderapuram, Ghaziabad (UP) Complete
160 Colliers International Seismic Analysis of NCR Campus for Accentures Pvt. Ltd. Complete